Severn Trent – Rushmoor STW

Hydrainer have been employed at Rushmoor STW to provide technical support and provision of associated pumps and plant to overpump full works flows in two separate areas, with a value of circa £35,000.

Hydrainer were selected because of the criticality of their specific element of work to the overall success of the Rushmoor team in achieving the desired outputs by Christmas 2012.

Specifically they provided technical expertise and equipment, over and above that specified, to demonstrate/prove and set up temporary plant, to a level that provided both security and accuracy of performance and reliability/contingency in the event of failure, all at highly competitive rates.